Meeting house 1st and 4th building row construction71 Lāčplēša street, Riga
The building will be constructed in two floors with a partially third floor, gabled roof and above the main entrance centered vertical accent – the tower. The main entrance will be highlighted with a walk-through portal. On the first floor will be located a spacious vestibule, followed by the intersection of hallways. In addition in the first floor will be built cabinets for staff, premises for meetings, classrooms, archive, library, technical premises. On the second floor will be a large meeting room and multifunctional room, what can be divided into smaller premises with drop partitions.
High-quality natural materials will be used in internal and external finishing works.
- Client:
- Foundation “COP Latvija”
- Name of the project:
- Meeting house 1st and 4th building row construction
- Category:
- Buildings
- Type of construction:
- Other public buildings
- Designer:
- SIA ”Sestais Stils”
- Description of work:
- New building
- Country:
- Latvia
- Adress:
- 71 Lāčplēša street, Riga
- Beginning of project:
- 2015
- Completion year:
- 2016
- Characteristic feature:
- Total area: 1325.50 m 2