Meeting house 1st and 4th building row construction71 Lāčplēša street, Riga

The building will be constructed in two floors with a partially third floor, gabled roof and above the main entrance centered vertical accent – the tower. The main entrance will be highlighted with a walk-through portal. On the first floor will be located a spacious vestibule, followed by the intersection of hallways. In addition in the first floor will be built cabinets for staff, premises for meetings, classrooms, archive, library, technical premises. On the second floor will be a large meeting room and multifunctional room, what can be divided into smaller premises with drop partitions.
High-quality natural materials will be used in internal and external finishing works.

 

 

Client:
Foundation “COP Latvija”
Name of the project:
Meeting house 1st and 4th building row construction
Category:
Buildings
Type of construction:
Other public buildings
Designer:
SIA ”Sestais Stils”
Description of work:
New building
Country:
Latvia
Adress:
71 Lāčplēša street, Riga
Beginning of project:
2015
Completion year:
2016
Characteristic feature:
Total area: 1325.50 m 2